-
本部構内設備サポート拠点(MaCBES)構成組織
Main Campus Base of Equipment Support
-
-
京都大学内設備共用組織
Kyoto University Facility Support Center
-
-
学外の設備共用機関
Other Equipment Sharing Organization
-
- 2020-08-27
- 機器デモンストレーションのお知らせ / Demonstration of Jess system
- 2020-07-01
- 【募集締切/Application Closed】【7月14日、15日】スピニングディスク共焦点顕微鏡システム Andor Dragonfly ハンズオントレーニング/【July 14 and 15】Hands on training session for spinning disk confocal microscope system Andor Dragonfly
- 2020-05-27
- 【募集締切/Application Closed】【6月16日、17日】スピニングディスク共焦点顕微鏡システム Andor Dragonfly ハンズオントレーニング/【June 16 and 17】Hands on training session for spinning disk confocal microscope system Andor Dragonfly
- 2020-04-07
- 《iCeMS解析センター》COVID-19の利用者感染防止のための特別体制について
- 2020-03-26
- 【募集締切/Application Closed】【4月9日、10日、14日、27日、28日】スピニングディスク共焦点顕微鏡システム Andor Dragonfly ハンズオントレーニング/【April 9, 10, 14, 27 and 28】Hands on training session for spinning disk confocal microscope system Andor Dragonfly
- 2020-02-26
- FACSs are not available on Mar12, 9:00am-14:00
- 2020-02-21
- BD FACS Aria training is held on Feb25-26 & Mar17-18
- 2020-01-09
- [B101, 102] Notification about the printer
- 2020-01-08
- [B002] 2020年 2月12日 定期点検/Feb 12, 2020 Periodic inspection
- 2019-12-23
- [B001] New 20X objective lens with extra long working distance available
- 2019-12-19
- [B101] Canto II is unavailable from 27th Dec to 5th Jan.
- 2019-12-12
- [B102] BD engineer has been fixed the problem with an abnormal value of Bright Bead % Robust CV of APC.
- 2019-12-03
- [B101, 102] BD's On-call maintenance on 3rd, 4th Feb, 2020
- 2019-12-03
- [B101, 102, 103] On-call maintenance by an engineer from the manufacturer on 3-4th Feb 2020
- 2019-10-18
- [B003] STED復旧/STED recovered
- 2019-10-09
- 機器の予約キャンセルについて
- 2019-10-08
- [B001] 連絡2点/2 announcements
- 2019-09-03
- [B102] Notification about drop formation
- 2019-08-18
- [B102] Start up service is not available on 22nd Aug
- 2019-06-25
- [B102] Aria II SORP is not available on 9th & 10th July.
- 2019-04-21
- [B101] BD FACS Aria training is held on 28th &29th May
- 2019-04-12
- [B101] BD FACS Aria training is held on 18th &19th Apr
- 2019-04-11
- [B001] 新レーザーユニットの出力/Output power of new laser unit
- 2019-04-05
- [B101] No start up service is available on 8th Apr
- 2019-03-08
- [B001] 4波長レーザーユニットの導入/Installation of 4-channel laser unit